IngePRO maroc

DESCRIPTION OF THE MISSION

Provision of detailed execution studies:

  • Assumptions note.
  • Structure stability calculation note.
  • Composite part calculation note.
  • Steel part calculation note.
  • Foundation design
  • Drawing of steel part
  • Drawing of concrete part

  • PROJECT DESCRIPTION

    multi-storey car park project in the bonded area of Port TANGER MED. This project is intended to evolve in time and space. It offers a total capacity of 4,000 parking spaces, spread over an area of 66,349m² on 3 levels. The goal is to optimize and preserve the TVR plot, and this through the elevation of the planned building. The project advocates the rationalization of construction resources and costs. The structural frame and the materials adopted make it possible to define modules and phases in the realization of the project.

    IngePRO maroc